WS2017 CAMP GATEWAY RISK ASSESSMENTS

21 May 2017
  • A RISK ASSESSMENT IS REQUIRED for EVERY camp gateway along with a basic sketch.
  • If the gateway has moving parts then this must be included in the initial design which is submitted to the sub camps along with a drawing/sketch
  • The initial sketch & risk assessment is to be with your Sub Camp Team by Saturday 15th July at the latest.
  • Then the initial risk assessment must be updated on completion, because things may change.
  • No risk assessment and sketch = no gate

Ardingly DOES NOT allow digging of holes for any reason.

Click here for WS2017 Gateway Risk Assessment Template